Surface Mount Area Light
$1.92 – $23.66Price range: $1.92 through $23.66
E05-WBS0-1 = white LED, black cover
E05-WSS0-1 = white LED, SS cover
E05-WWS0-1 = white LED, white cover
E05-0B00-1 = Round bar mount adapter
Description
This E05 TecNiq area light has an integrated On/Off switch and is available with a 316 stainless steel cover, or high-impact white cover, or high-impact black cover.
- Great appearance, hidden fasteners
- 220 Lumens of light
- Can be mounted flat, or purchase the 1″ round bar bracket that allows mounting on 1″ round tube
- Integrated switch in the surface of the light
- 4″ long by 1″ high by .6″ thickness
- Mounting screw holes are 3.25″ apart
- 9-12v DC operation
- 3 LEDs
Additional information
| Weight | .1 lbs |
|---|---|
| Dimensions | 4 × 1 × 1 in |
| Case Color | Black, Stainless steel, White, Round bar adapter |
Be the first to review “Surface Mount Area Light” Cancel reply
You must be logged in to post a review.
Related products
-


2.5 x 1.25″ LED Marker Light”
$5.25 – $7.99Price range: $5.25 through $7.99 Select options This product has multiple variants. The options may be chosen on the product page -

LED Identification Light
$21.00 Add to cart -

LED Warning Light (strobe)
$45.00 – $55.00Price range: $45.00 through $55.00 Select options This product has multiple variants. The options may be chosen on the product page -
Sale!

6.5″ Oval Amber LED Strobe Light kit
$75.00Original price was: $75.00.$68.75Current price is: $68.75. Add to cart




Reviews
There are no reviews yet.